151/245 
Building Technologies Division  Basic Documentation LME7...   CC1P7105en 
Infrastructure & Cities Sector  19 PME73.840...  29.11.2011 
 
19.2.3  Gas pilot ignition 1 (Gp1/2), 1-stage, with valve proving 
 
SV
V1
Program
Gp1/2
Gas pilot 1, 1-stage
PV
X7-01 X7-04
V2
X7-02
LME73.000...
 
Figure 78: Connection diagram fuel train gas pilot ignition 1 (Gp1/2), 1-stage, with valve proving 
 
19.2.4  Gas direct ignition 1 (Gp1/2), 1-stage, with valve proving 
 
SV
V1
Program
Gp1/2
Gas direct 1, 1-stage
V2
X7-02
LME73.000...
X7-04X7-01
 
Figure 79: Connection diagram fuel train gas direct ignition 1 (Gp1/2), 1-stage, with valve proving 
 
 
Note: 
When valve proving is activated (e.g. on shutdown), the load on the valve’s 
terminals (according to chapter Technical data/Terminal rating Outputs) is 
restricted.  
 
Fuel valve 1 X7-04 pin 4/fuel valve 2 X7-02 pin 3/auxiliary output AUX 
  Rated voltage  AC 120 V  AC 230 V 
      50/60 Hz  50/60 Hz 
  Rated current  1 A    1 A 
 Power factor  cos >0.4  cos >0.4 
 
If the terminal load (according to chapter Technical data/Terminal rating 
Outputs) is not reduced (max. rated current 2 A, cos >0.4), the design 
lifetime will be reached after about 100,000 burner startup cycles!