EasyManua.ls Logo

Siemens SICAM P35 - Maintenance

Siemens SICAM P35
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
7.1 Maintenance
SICAM P35 P36, 3-phase Multi-Function Power Meter, User Manual
E50417-H8940-C562-4, Release Date 06.2018
50
7.1 Maintenance
Voltage connection should be conducted strictly in accordance with voltage level marked on nameplate.
Tighten the terminals and hang the meter securely to screen which is strong, refractory and vibration-free
during installation. Upward view of the meter provides the best display effect, so it should be installed verti-
cally.
The meter should be stored in environment free of condensation at -35 to 70 and 95% humidity in
original package. At most 5 layers are allowable for stacking. The meter is inappropriate for storing after un-
packing. The meter should be stored in clean location free of hazardous substances or gas which may cause
corrosion in air.
In the operating environment of the meter, lightning protection should be provided.

Related product manuals