4 Project planning for control and indicating panels
4.4 SIGMASYS M control and indicating panel assignment
Figure 5: SIGMASYS M control and indicating panel assignment
For exact details on where to install the APL20P, see the document
A24230-B60-A1-*-31
18 / 128 BMT Project Planning Guidelines
Best.Nr. A24205-A337-B970 – Edition 12 (03/07)