1 Remove the machine from the transport
base. Remove
wedge
(Figure 1
).
2
Remove the 4 screws
with
a screwdriver
(Figure 2.1
).
3 Remove transportation protection
devices
: Both bolts
are for this
purpose
(Figure 2.2
)
remove with
a 10 mm or 13 mm spanner (depending
upon model).
Check to see that both plastic inserts
on the connecting carrier have also
been removed.
Refasten the screws
at their original
locations.
4
Close off both holes with the
provided caps
(found in the
accessories package).
(
Figure 2.3
)
Before the machine is used for the first time, all transportation protection devices
from the back of the appliance must be removed and stored for any later transport
(i.e., relocation).