EasyManua.ls Logo

Sigma TANDEM VECTOR - Page 47

Sigma TANDEM VECTOR
175 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 9:X
SIGMA TANDEM SYSTEM OWNER’S MANUAL
11301 - 00.00.0000 Section 2: Equipment • Chapter 3 - Packing the Reserve w/ Skyhook
Flake the material between the upper control
lines toward the outside of the pack job, leaving
the control lines stacked neatly on the top of
the A, B, C, and D lines.
Repeat the above steps for the other side as
performed previously. Make sure the line
channel in the center of the pack job is clear.
Note: the exposed split nose to each side of pack
job.
Prepare the center cell material to cocoon the
canopy.

Table of Contents