3. Operation Ⅰ
3.1 Preparation before operation
1
)
Ensure that there is no fire around the EVSE and the surrounding space is not blocked.
2
)
Ensure there is no damage on the cable.
3
)
Ensure that the EVSE is maintained regularly. Refer to section 4.
4
)
No need to set network or change any system settings following section 3.2/3.3.
3.2 Charging procedure
(EVSE with display)
3.2.1 Connect to the connector
1
) Take the charge cable from the enclosure or the hunger installed on the pedestal (refer to section 3.5)
and connect it to the EV.
2
) After the connector is inserted correctly, the EVSE will be ready for charging.
3.2.2 Standby screen
1
)
The display shows the standby screen as shown in the figure when the EVSE is in the idle status.
2
)
The lights on the enclosure turn from dark to green, as shown in the figure below.