EasyManua.ls Logo

Singer 144W204 - Machine Oiling and Belt Maintenance; Machine Oiling Guidelines; Removing Arm Shaft Connection Belt; Sewing Hook and Feed Timing Alignment

Singer 144W204
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OILING
THE
MACHINE
When
the machines
are
received
from the
factory,
they
should
be
thoroughly
cleaned
and
oiled.
When
in
continuous
use,
they
should
be
oiled
of
least
twice
a
day.
Use "TYPE
B"
or
TYPE
D"
OIL,
sold
by
The
Singer
Comnanv.
F1g.
2.
Front
View
of
Machine
144w204
Showing
Oiling
Points
Od should be
opri,Rd
ot
each
of
the
places
designotc:d by
arrows
If\
l1gs
2,
3,
4,
5,
10
and 27.
21
TO
REMOVE
THE
ARM
SHAFT
CONNECTION
BELT
FROM
WITHIN
THE
ARM
Slide the
connection
belt
off
the
lower
belt
pulley;
remove
the
machine
pulley.
loosen
the
three
screws
in the arm shaft bushing
near
the
machine
pulley'
and
remove
the bushing;
lift
the
belt
up
through
the
arm
cop
hole
as
far
as
possible
and
draw
it
out
through
the
space
normally
occupied
by
the bushing.
Owing
to
the
fact
that
the
sewing
hook
makes
two
revolutions
to
one
revolution
of
the
hook
driving
shaft,
and
that
the
feed
lilting
eccentric
is
on
the
hook
driving
shalt, it
is
possible
to
have
the
sewing
hook
correctly
timed
without
having
the
feed
correctly
timed.
To
overcome
this, the
plate
(F2, Fig. 24)
is
attached
to
the
underside
of
the
bed
of
the
machine. This
plate
is
marked
with
on
arrow
at
its
lower
end
and
directly
alongside
of
the
plate
is
the
collar
(G2,
Fig. 24)
mounted
on
the
hook
shalt,
which
is
also
marked
with
an
arrow.
Alter
replacing
the
belt
over
the
upper
pulley,
replace
the
arn1
shalt bushinq
and
securely
fasten it in
position
by
its
three
screws;
replace
the machine
pulley.
With
the
belt
on
the
upper
pulley,
turn the
machine
pulley
from
you
until the
thread
toke- up
lever
is
at
its
highest
point.
Then turn the
hook
shalt
with
the
fingers
until the
two
arrows,
one
on
the
plate
(F2)
and
the
other
on
the
collar
(G2),
ore
directly
in line.
Now,
without
disturbing
either
the arm shaft
or
the
hook
shaft, slip the
belt
over
the
lower
pulley.
The
feed
will
then
be
correctly
timed
with
the
needle
bor.
Fiq. 24. T1ming P!ote
and
1iming
Collflr
CAUTION:
DO
NOT
PINCH BELT in
handling,
as
this
will
put
a
permanent
kink
in
the
wire
reinforcements.
Do
not
store
near
radiator
or
other
hot
place;
prefeĀ·10bly
in a
cool,
dark
place
until
belt
is
installed
in
machine.
From the library of: Superior Sewing Machine & Supply LLC

Related product manuals