TRANSPORTING AND LIFTING THE MACHINE
TB18 Plus&20J Plus Operation Manual 8-3 © Apr 2022
TRANSPORTING THE
MACHINE
Follow these requirements when transporting the
machine by truck or trailer:
1. Before transport, turn the key switch on ground
controller to OFF, and remove the key.
2. Perform a thorough inspection of the machine to
prevent loose or untightened components and
ensure the safety pin of turntable is locked.
3. Ensure the rope or belt is of sufficient capacity.
4. Use at least 4 ropes/belts to fasten the chassis and
one rope/belt for the platform.
5. Adjust the rigging to prevent damage to the rope/
belt.
6. To protect the boom components and platform load
sensors, do not apply too large a downward force to
the rope/belt fastened near the platform. It is
recommended to add a foam layer beneath the
platform and ensure the platform is suspended in
the air.