Specific location requirements for L.P. propane gas-fired boilers due to gas density.
Boiler installation must conform to national and local codes and authority requirements.
Installation, connection, servicing, and repair must be done by trained, qualified technicians.
Provides dimensional data for various Galaxy GG, GXH, GXHA, GX, and GXHA boiler models.
Lists orifice sizes for different boiler models based on gas type and input.
Requirements for locating natural gas boilers, emphasizing a level foundation and proximity to the chimney.
Specific warnings and precautions for L.P. propane gas boiler placement due to gas density.
Guidance on providing a solid, level foundation for the boiler, considering weight and floor type.
Detailed requirements for venting Galaxy boilers, including types of chimneys and specific conditions.
Specifies minimum clearance distances from combustible materials for different boiler models.
Details minimum clearance requirements for various Galaxy boiler series from combustible construction.
Emphasizes keeping the boiler area clear of combustibles, gasoline, and flammable vapors.
Guidelines for proper installation of vent piping, including size, dampers, and slope.
Instructions for gas piping, including local codes, pipe sizing, and leak testing.
Covers electrical power requirements, grounding, and basic control wiring diagrams.
Explains the necessity of ample combustion and ventilation air, and specific requirements.
Information on the draft hood, stating it's part of the assembly and should not be altered.
Details piping for circulating water systems, including air control and pump location.
Instructions for assembling and installing steam controls like low water cut-off and pressure gauge.
Guidelines for piping low pressure steam boilers according to engineering practices and codes.
Illustrates recommended piping for parallel flow steam systems with wet or dry condensate return and a Hartford Loop.
Details counter flow piping for steam systems, emphasizing sizing and pitch for efficient operation.
Outlines crucial steps before starting vent damper installation, including safety checks.
Specifies where to install the vent damper and required clearances from combustible materials.
Step-by-step instructions for installing the vent damper, including wiring connections.
Procedures after vent damper installation, including operational checks and cover replacement.
Guidance on adjusting the heat anticipator when a vent damper is installed.
Initial checks before firing the boiler and filling/venting water systems.
Procedures for cleaning, filling, and preparing a new steam boiler for operation.
Critical safety warnings and instructions to follow before lighting the boiler.
Step-by-step guide for lighting the pilot and main burners, with safety checks.
Instructions for lighting and operating boilers with continuous burning pilot systems.
Operation and safety information for boilers equipped with intermittent pilot ignition systems.
Procedures for safely shutting off the gas supply to the appliance.
Procedures for adjusting gas input rate, including consulting gas supplier and using a gas rate table.
How to adjust main burner flame characteristics for optimal combustion.
Procedures for checking main burner ignition, pilot adjustment, and safety shutdown functionality.
Checks for safety controls like blocked vent and rollout switches, and following maintenance procedures.
Procedures for checking electronic probe and float-type low water cut-off controls.
Steps to verify the proper operation of the steam pressure control.
Considerations when replacing an older steam boiler with a new one.
Detailed instructions for blowing off steam boilers, with and without tankless heaters, to remove oil and grease.
Procedure for cleaning the piping system to remove oil film.
Routine checks for boiler heating surfaces, controls, piping, and water level.
Recommended annual inspection and cleaning tasks for safe and reliable operation.
Tests for high limit control and gas valve safety shutdown functionality.
Guidance on using antifreeze and the importance of water treatment programs.
Reiterates the importance of keeping the boiler area clear of flammable materials.
Describes the sequence of operations for boilers with a continuous burning pilot system.
Details the sequence of operations for boilers with Honeywell intermittent pilot ignition systems.
Wiring diagrams for hot water boilers with continuous pilot and vent damper.
Wiring diagrams for hot water boilers with continuous pilot, vent damper, and combination control.
Wiring diagrams for high-input hot water boilers with continuous pilot and optional vent damper.
Wiring diagrams for high-input hot water boilers with continuous pilot, optional vent damper, and combination control.
Wiring diagrams for steam boilers with continuous pilot, vent damper, and MM-67 Low Water Cut-Off.
Wiring diagrams for steam boilers with continuous pilot, vent damper, and electronic Low Water Cut-Off.
Wiring diagrams for high-input steam boilers with continuous pilot and optional vent damper.
Wiring diagrams for high-input steam boilers with continuous pilot, optional vent damper, and MM-67 L.W.C.O.
Wiring diagrams for hot water boilers with intermittent ignition, vent damper, and combination control.
Wiring diagrams for steam boilers with intermittent ignition, vent damper, and MM-67 L.W.C.O.
Wiring diagrams for steam boilers with intermittent ignition, vent damper, and electronic L.W.C.O.
Wiring diagrams for steam boilers with intermittent ignition, optional vent damper, and electronic L.W.C.O.
Wiring diagrams for high-input steam boilers with IID, optional vent damper, and MM-67 L.W.C.O.
Wiring diagrams for high-input hot water boilers with IID, optional vent damper, and combination control.
Wiring diagrams for hot water boilers with IID, vent damper, and hi-limit control.
Wiring diagrams for hot water boilers with IID, optional vent damper, and hi-limit control.
Wiring diagrams and notes for pump or valve zoning of water boilers using combination controls.
Diagrams for pump zoning systems using R845 relays and R8230C relays.
Diagrams for zone valve zoning systems using Honeywell V8043F zone valves.
Troubleshooting common problems like burners failing to operate or not shutting off.
Addresses issues like flashback at orifices and delayed ignition.
Troubleshooting for fumes, gas odors, and condensation in flues or vent systems.
Illustrates a method for piping a heating-cooling system with a water boiler and chiller.
Guidance on identifying and ordering replacement parts, including model and serial number references.
Step-by-step procedure for removing an existing boiler from a common venting system safely.