18_06_07_Battery Backup Distribution_10010371_ENG_V1.8 Seite -19- von -38-
5.3.2 Cable entry – Single-Phase Battery Backup Distribution
recommendation: Take the knockouts at the bottom
type terminal block cable (e.g.)
M40 X1 alternatively 4 x 16mm
2
+ enlargement adaptor X2 5 x 16mm
2
M32 X1 4 x 16mm
2
X2 5 x 16mm
2
X3 3 x 10mm
2
M25 speedwire-cable -CAT 5/7e-
(special sealing) (E-Meter/Home-Manager)
M25 X5 3 x 6mm
2
M20 X4 – 2x (L1/N + 1/2) 3 x 1,5mm
2
X5 (1/2) 3 x 1,5mm
2
X5 (3/4) 4x2x0,8mm
2
(e.g. J-Y(St)Y Lg)*
PE
1 x 16mm
2
M12 equalising membrane – mount on reduction-
adaptor M20!)
* shielded cable