EasyManua.ls Logo

SMA Enwitec Sunny Island 4.4M - 15 Maintenance and Cleaning (Spare-Fuse)

SMA Enwitec Sunny Island 4.4M
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18_06_07_Battery Backup Distribution_10010371_ENG_V1.8 Seite -32- von -38-
NOTICE
15. Maintenance and cleaning (spare-fuse)
You should do a frequent short inspection of your Battery Backup Distribution for keeping a
long durability and avoiding an operational breakdown of the system. Please also consider
your national standards and provisions regarding the requirements of PV-power installations
and their equipment. Potentially, you have to do an electrical test procedure once a year, as
it is to adduce in Germany.
If you notice faulty fuses: There must be a reason for that please check your electrical
installation and ensure the proper functionality of the affected electric circuit (F1 and
F5: Ferrule Fuses!)
This fuse characteristic is mandatory regarding the ferrule-fuse F1+ F5:
- nominal cold resistance: >= 0,2 e.g. Littelfuse
- max. melting integral: 1A
2
s KLKD 1A
- enwitec part-number: 10010783
Visual inspection
Dependent on the installation side and the environmental conditions you have to expect
pollution on the devices surface. Clean carefully with the help of a moist cloth! During this
time do not open the case of the device under any circumstances (transparent cover has to
be closed)!
Concerns only 3-PH Battery Backup Distribution: You have to check the outlet-filters in
addition! Please have a look at the air-inlet; in case of a dirt buildup
you have to clean carefully with the help of a moist cloth!

Table of Contents