SMA SUNNY BOY 5.0 - Checking for Ground Faults

SMA SUNNY BOY 5.0
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Event number Message, cause and corrective measures
27331
Update transport started
The inverter has successfully started the update.
27332
Update transport successful
The update file has been successfully transferred to the communication compo-
nent.
29001
Inst. code valid
The entered GridGuard code is valid. Protected parameters have now been
unlocked and you can adjust the parameters. The parameters will be automati-
cally locked again after ten feed-in hours.
29004
Grid parameters unchanged
Changing the grid parameters is not possible.
8.3 Checking the PV System for Ground Faults
If the inverter displays the event numbers 3501, 3601 or 3701, there could be a ground fault. The
electrical insulation from the PV system to ground is defective or insufficient.
Danger to life due to electric shock
In the event of a ground fault, high voltages can be present.
Touch the cables of the PV array on the insulation only.
Do not touch any parts of the substructure or frame of the PV array.
Do not connect PV strings with ground faults to the inverter.
Destruction of the measuring device due to overvoltage
Only use measuring devices with a DC input voltage range of 600V or higher.
Procedure:
In order to check the PV system for ground faults, perform the following actions in the prescribed
order. The exact procedure is described in the following sections.
Check the PV system for ground faults by measuring the voltage.
If the voltage measurement was not successful, check the PV system via insulation resistance
measurement for ground faults.
Test by Measuring the Voltage
Proceed as follows to check each string in the PV system for ground faults.
8 Troubleshooting
SMA Solar Technology America LLC
User Manual 55SB5.0-6.0-1SP-US-40-BA-en-10