EasyManua.ls Logo

SMA SUNNY BOY 5000TL - 13 Decommissioning; 13.1 Disassembly; 13.2 Packaging; 13.3 Storage

SMA SUNNY BOY 5000TL
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SMA Technologie AG Decommissioning
Installation Guide SB40TL_50TL-IEN081211 71
13 Decommissioning
13.1 Disassembly
1. Open the Sunny Boy as described in section 8.1 „Opening the Sunny Boy” (Page 49).
2. Remove all cables from the Sunny Boy.
3.
4. If mounted using top hat rails: Loosen the screw between the housing and wall.
5. Close the lid with six screws.
6. Attach the Electronic Solar Switch.
7. Open the lock if necessary.
8. Push the Sunny Boy to the left and remove it from the wall bracket or the top hat rail.
13.2 Packaging
If possible, please pack the Sunny Boy in the original packaging.
If this is no longer available, you can use an equivalent box which fulfills the following requirements:
Suitable for loads of at least 25 kg
With handle system
Can be closed fully
13.3 Storage
Store the Sunny Boy in a dry place where ambient temperatures are always between -25 °C and
+60 °C.
13.4 Disposal
Dispose of the Sunny Boy at the end of its service life in accordance with the disposal regulations
for electronic scrap which apply at the installation site at that time. Alternatively, send it back to SMA
with shipping paid by sender, and labeled "ZUR ENTSORGUNG" ("for disposal") (contact: see
Page 72).
CAUTION!
Danger of burn injuries due to hot housing parts!
Wait 30 minutes for the device to cool before dismantling it.

Related product manuals