EasyManua.ls Logo

SMA SUNNY TRIPOWER 60 - 5.4 Direct Marketer Interface (Unit ID = 200)

SMA SUNNY TRIPOWER 60
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SMA Solar Technology AG 5 Technical Data
Installation Guide SHP75-10-STP60-10-IA-xx-18 45
5.4 Torque Specifications
Figure 5.2 Overview of inverter with torque indications
Torques SHP 75-10
Table 5.7: Torques SHP 75-10
Parameters Tools Torque
A M63 cable gland Wrench 65/68 mm 11 Nm
Swivel nut of the M63 cable gland Wrench 65/68 mm 9.5 Nm
B AC terminals HX 8 x 50 20 Nm (cable sheath diameter = 35 to 95 mm);
30 Nm (cable sheath diameter = 96 to 150 mm);
C Primary grounding conductor
(secondary grounding conductor
directly to the right of it)
TX 30 3.9 Nm
D PV terminals HX 8 x 50 20 Nm (cable sheath diameter = 35 to 95 mm);
30 Nm (cable sheath diameter = 96 to 150 mm);
E M32 cable gland Wrench 42 mm 6 Nm
Swivel nut of the M32 cable gland Wrench 42 mm 1.8 Nm
F M25 cable gland Wrench 33 mm 4 Nm
Swivel nut of the M25 cable gland Wrench 33 mm 1.8 Nm
GM6 equipment grounding
(equipotential bonding terminal)
TX 20 3.9 Nm
Front screw (not shown) TX 30 1.5 Nm

Table of Contents

Other manuals for SMA SUNNY TRIPOWER 60

Related product manuals