EasyManua.ls Logo

Smartrise HPV900 - Grounding Requirements; Figure 3: Ground Bus Terminal

Default Icon
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Drive Startup Manual HPV900-Induction
March 5, 2020 ©2020 Smartrise Engineering, Inc. All Rights Reserved Page 3
Grounding Requirements
NOTE: A proper and effective building ground connection is required for the safe and successful
operation of the controller.
Examples of a proper building-to-controller ground is as follows:
Attach the ground wire to the street side of a water main.
Attach the ground wire to a grounding rod in the pit.
The controller has a common ground bus terminal connection.
Figure 3: Ground Bus Terminal
The building, motor, transformer, and filter(s) must all share a common ground. This
removes ground loops, limits impedance, and routes noise into the ground.

Related product manuals