Drive Startup Manual HPV900-Induction
Page 4 © 2020 Smartrise Engineering, Inc. All Rights Reserved March 5, 2020
Wiring
A checklist must be completed during the drive wiring process. See Appendix 1 Terminal
Locations for wiring information.
Power
Perform the following to connect power. See C4 Controller sheet 03 Machine Room for job
specific information.
Connect main line power to terminal blocks L1/L2/L3.
Connect the ground wire to the yellow/green terminal block next to L1-L3.
Brake
Perform the following to connect the brakes. See C4 Controller sheet 05 Brakes for job specific
information.
Connect the main brake wiring to terminal K1 / K2 and the secondary brake wiring (if
equipped) to terminals J1 / J2 located on the terminal block next to the M Contactor.
Motor / Encoder
Perform the following to connect the drive to the motor and encoder cable. See C4 Controller
sheet 04 Motor and Drive Connections for job specific information.
Connect motor leads to the M contactor at T1/T2/T3.
Connect the encoder cable to the drive terminal block TB1. See Appendix 1 Terminal
Locations for wiring samples and Appendix 1 Terminal Locations for wire terminal
locations.
The table below lists the Terminal Descriptions. Record the encoder wiring color code for future
release.
Table 1: Terminal Descriptions
TB1 Signal Description On-Site Color