EasyManua.ls Logo

SolarEdge SE20K - Page 33

SolarEdge SE20K
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Lift the Synergy Unit from the sides, or hold it at the top and bottom of the unit
to lift into place.
Align the two indentations in the enclosure with the two triangular mounting
tabs of the bracket, and lower the unit until it rests on the bracket evenly (see
Figure 14
).
For the right or left Synergy Units, insert only one screw through the outer
(exposed) side of the unit and into the bracket. Tighten the screws with a torque
of 4.0 N*m (see
Figure 13
).
NOTE
For the center Synergy Unit, use both side screws.
Figure 13: Hanging the Synergy Unit
8.
Hang the Synergy Manager:
a. Lift the Synergy Manager from its sides.
b. Align the two indentations in the enclosure with the two triangular mounting
tabs of the bracket, and lower the unit until it rests on the bracket evenly (see
Figure 14
).
c. Insert the supplied bracket screw through the right side of the heat sink and
into the bracket.
Chapter 3: Installing the Synergy Manager and Synergy Units32
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx

Table of Contents

Related product manuals