EasyManuals Logo

SolarEdge SE7k User Manual

SolarEdge SE7k
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #34 background imageLoading...
Page #34 background image
Figure 13: Attaching a Ferrite bead
6.
Connect the AC, as follows. Connect the PE (grounding) wire first.
Wire type
Connect to
terminal
Figure 14: AC Terminals
Line 1 L1
Line 2 L2
Line 3 L3
Neutral N
PE (grounding)
NOTE
If power control is enabled, it is important to respect the order of grid lines
connection to the inverter. A 120deg phase difference should be kept
between L1 to L2 and between L2 to L3 (L1-L2-L3 and not, for example L1-L3-
L2).
If the grid lines are not in this order, an error is displayed on the LCD screen
and the inverter will not produce power.
7. Connect the wires to the appropriate terminal block connectors in the inverter.
Tighten the terminal block screws with a torque of 1.2-1.5 N*m / 0.88-1.1 lb*ft.
8. Check that the wires are fully inserted and cannot be pulled out easily.
9. Tighten the AC cable gland with a torque of 2.8-3.3 N*m / 2.0-2.4 lb*ft.
10. Verify that there are no unconnected wires to the inverter and that the unused
terminal screws are tightened.
Chapter 4: Connecting the AC and the Strings to the Inverter 33
Three Phase System Installation Guide MAN-01-00057-4.1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge SE7k and is the answer not in the manual?

SolarEdge SE7k Specifications

General IconGeneral
ManufacturerSolarEdge
ModelSE7k
CategoryInverter
Max. DC Power9450 W
Max. AC Power Output7000 W
Rated AC Power7000 W
AC Frequency50/60 Hz
TopologyTransformerless
Warranty12 years
Communication InterfacesRS485, Ethernet
CoolingConvection
Operating Temperature Range-25°C to 60°C

Related product manuals