EasyManua.ls Logo

SolarEdge SE4000 - User Manual

SolarEdge SE4000
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Installation Guide
SolarEdge System
Installation Guide
For Europe and APAC
Version 4.1

Table of Contents

Questions and Answers:

SolarEdge SE4000 Specifications

General IconGeneral
ModelSE4000
ManufacturerSolarEdge
Rated AC Power4000 W
CEC Weighted Efficiency97.5%
Number of MPP Trackers1
Protection RatingIP65
CoolingNatural Convection
Warranty12 years
AC Output Power4000 W
AC Voltage220 / 230 / 240 Vac
Max. DC Input Power5400 W
Operating Temperature Range-25°C to 60°C

Summary

HANDLING AND SAFETY INSTRUCTIONS

Important Safety Instructions

Provides critical safety warnings and precautions for installation and operation of the system.

Chapter 1: Introducing the SolarEdge Power Harvesting System

Chapter 2: Installing the Power Optimizers

Optimizer Installation Safety

Highlights safety precautions and warnings specific to installing power optimizers.

Mounting the Power Optimizers

Step-by-step instructions for physically mounting power optimizers to the support structure.

Connecting PV Module to Optimizer

Instructions for connecting PV modules to the input connectors of the power optimizers.

Connecting Optimizers in Strings

Describes how to connect multiple power optimizers in series to form strings.

Verifying Power Optimizer Connection

Steps to verify correct wiring and polarity of power optimizer strings using voltage measurements.

Chapter 3: Installing the Inverter

Mounting the Inverter

Provides detailed instructions and clearance requirements for mounting the inverter vertically and horizontally.

Chapter 4: Connecting the AC and the Strings to the Inverter

Connecting the AC Grid to the Inverter

Step-by-step guide for connecting the AC power supply to the inverter terminals.

Connecting the Strings to the Inverter

Instructions for connecting DC strings from PV modules to the inverter's DC input.

Chapter 5: Commissioning the Installation

Activating the System

Steps for system activation using the activation card and verifying initial status.

Pairing Power Optimizers to the Inverter

Process for logically assigning power optimizers to their respective inverters.

Verifying Proper Activation

How to confirm successful system activation and operational readiness via the inverter LCD.

Chapter 6: User Interface

Chapter 7: Setting Up Communication

Appendix A: Errors and Troubleshooting

Appendix C: Connecting the AC and DC Strings to the DC Safety Unit

Appendix F: Replacing and Adding System Components

Appendix G: Determining the Circuit Breaker Size

Related product manuals