Chapter 5: Commissioning the Installation
This chapter describes how to activate the system, pair the poweroptimizers to the
inverter and verify the proper functioning of the system.
Step 1: Activating the System
1. Verify that the inverter ON/OFF switch is OFF.
2. Verify that the DC Safety Unit (if applicable) is in the OFF position.
3.
Remove the inverter cover: Open the inverter cover’s six Allen screws and carefully
pull the cover horizontally before lowering it.
WARNING!
ELECTRICAL SHOCK HAZARD. Do not touch uninsulated wires when the
inverter cover is removed.
4.
Activate the inverter:
a. Verify that the card S/N matches the inverter S/N.
b. Insert the card into the "CARD" slot on the communication board.
c. Turn ON the AC switch of the main circuit board.
d. LCD shows: Running Script...è Done!
Figure 16: Activation card
If LCDshows: Failed:
Turn AC OFF and ON (reset), and repeat the activation process.
Use the activation code that appears on the certification inverter label to
manually activate the inverter.
If the problem persists, contact SolarEdge Support.
-Three Phase System Installation Guide MAN-01-00057-4.1
36 Chapter 5: Commissioning the Installation

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge SE4000 and is the answer not in the manual?

SolarEdge SE4000 Specifications

General IconGeneral
ModelSE4000
ManufacturerSolarEdge
Rated AC Power4000 W
CEC Weighted Efficiency97.5%
Number of MPP Trackers1
Protection RatingIP65
CoolingNatural Convection
Warranty12 years
AC Output Power4000 W
AC Voltage220 / 230 / 240 Vac
Max. DC Input Power5400 W
Operating Temperature Range-25°C to 60°C

Related product manuals