5.
Drill two holes where marked.
Figure 5: Drilling holes
6. Install the conduit holder.
7.
Tighten the conduit holder to the mounting surface with two screws.
Figure 6: Securing the conduit holder with screws
8. Tighten the conduit holder to the outer left fin with the supplied screw. Tighten the
screw with a torque of 41 lb*in / 4.7 N*m.
Backup Interface Installation Guide MAN-01-00728-1.0
12 Installing the Conduit Holder

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge StorEdge BI-NUSGN-01 and is the answer not in the manual?

SolarEdge StorEdge BI-NUSGN-01 Specifications

General IconGeneral
BrandSolarEdge
ModelStorEdge BI-NUSGN-01
CategoryRecording Equipment
LanguageEnglish

Related product manuals