Installation Guide
Backup Interface for Single
Phase Energy Hub Inverter with
Prism Technology
for the main lug only
North America
Version 1.0

Questions and Answers:

SolarEdge StorEdge BI-NUSGN-01 Specifications

General IconGeneral
BrandSolarEdge
ModelStorEdge BI-NUSGN-01
CategoryRecording Equipment
LanguageEnglish

Summary

Handling and Safety Instructions

Chapter 2: Installing and Connecting the Backup Interface

Mounting the Backup Interface

Provides instructions and considerations for physically mounting the Backup Interface.

Installing the Conduit Holder

Guides the user through the process of installing the conduit holder for cable management.

Backup Interface Interfaces

Connecting the Backup Interface to the Grid and AC Loads Panel

Explains how to connect the Backup Interface to the main power grid and the AC loads panel.

Connecting the Backup Interface to the Inverter

To connect to the AC cable

Details the process for connecting the AC power cable to the inverter.

Connecting the Backup Interface to an External Rapid Shutdown Switch

Chapter 3: System Configuration

Troubleshooting

Appendix A: Manually Switching the System to the Grid-connected Mode

Appendix B: Connecting External CTs

Appendix C: System Performance LED Indication

Related product manuals