Welding operation
Operating Instructions Soyer Bolzenschweißtechnik 45
12. Welding operation
In the following, it is described how weldings are carried out and how possible
welding errors can be avoided.
12.1 Carrying out welding
In the following, it is described how weldings are carried out with a stud welding
gun.
Danger from incorrect operation
During stud welding, incorrect operation of the devices may cause many
dangers.
• Before using the stud welding device, see chapter “2. Important safety
instructions” on page 8.
• If you have any problems understanding the operating instructions, contact
the manufacturer, Soyer.
Carrying out welding
Step 1: Before welding, see chapter “2. Important safety instructions” on
page 8
Step 2: Connect the gun to the stud welding device (see chapter “10.2
Connection of the stud welding device and the stud welding
guns” on page 40).
Step 3: Insert the appropriate stud chuck and a welding stud (see chap-
ter “8. Description of the PS-9K ACCU stud welding gun” on
page 32 and chapter “9. Description of the stud chuck” on
page 35).
Only use SOYER® welding studs.
Step 4: Check the charging voltage (see chapter chapter “11.1 Adjusting
the charging voltage on the stud welding device” on page 43).
Step 5: Ensure that the welding points on the stud and workpiece are
metallically bright.