EasyManua.ls Logo

Spaceman 6210 - Critical Maintenance Precautions

Spaceman 6210
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IMPORTANT:
Cleaning and sanitizing
schedules are governed by state
or local regulatory agencies and
MUST be followed accordingly.
Routine maintenance MUST be
performed a minimum of once
every three days.
CAUTIONS:
Do NOT run the machine without properly lubricating
required parts.
Do NOT clean the machine with abrasive or toxic chemicals
and cleaners. Doing so may cause damage to the stainless
steel material.
ONLY use Spaceman-USA-included cleaning brushes and lubrication.
NEVER use metal objects to clean or operate the machine.
ALWAYS replace wearable parts a minimum of every 3 months.
ALWAYS prime machine prior to operating.
ALWAYS inspect parts for excess wear and damage.
Spaceman USA 6210 Training rev111918

Related product manuals