EasyManuals Logo

SpringWell SPRW-UV4-2 User Manual

SpringWell SPRW-UV4-2
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
11|Page
Step 13: Plug the lamp connector into the lamp. Note the
keying for proper alignment (see Figure 8a, 8b). Insert the
lamp connector into the gland nut and turn the connector
approximately ¼ turn to lock the connector to the gland nut as
in Figure 9.
Step 14: Tighten the capve ground screw to the ground lug
on the UV reactor to ensure proper grounding(Figure 10).
Step 15: Your system is now ready to be plugged into the
appropriate GFCI protected outlet. Refer to the following
secon before any water is allowed to ow through the system.
System Disinfecon
With a new installaon, or any me the UV system is shut
down for service, without power, or is inoperave for any other
reason, the lines in the home or facility could be contaminated.
Use the following steps to fully disinfect the lines throughout
the enre home or facility.
Step 1: Check for and remove any dead ends” in the lines
throughout the home as these can harbor bacteria. Plug in the
UV system and wait unl it is ready for operaon.
Step 2: Remove the lter cartridge from the last sump and ll
it with 1-2 cups of household bleach (most are 5.25% chlorine).
Replace the sump and slowly turn on the water supply.
Step 3: At a water outlet, run the water unl bleach can
be smelled. Repeat this for all faucets, toilets, shower heads,
refrigerators, outdoor taps, the washing machine, dishwasher,
etc. at the home or facility. Once nished, wait a minimum of 30
minutes before connuing.
Step 4: Reinstall the lter cartridge into the sump and ush
the chlorine soluon by opening all faucets unl chlorine can
no longer be detected. Your home has now been completely
disinfected with your UV system ready to inacvate any
microorganisms that enter the home.
Cleaning the Quartz Sleeve
Depending on the water quality, the quartz sleeve may require
periodic cleaning. At a minimum, the quartz sleeve should be
cleaned on an annual basis. The following steps outline a basic
cleaning procedure.
Step 1: If a by-pass assembly is installed, shut the inlet valve
o to prevent water ow through the system. Otherwise, turn
o main water inlet valve (and/or turn o the water pump).
Step 2: Disconnect power cord of UV system from electrical
outlet.
Figure 8a. Standard
Output UV Lamp
Connecon
Figure 8b. High Output
UV Lamp Connecon
Figure 9. Lamp
Connector
Figure 10. Ground
Screw Connecon

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SpringWell SPRW-UV4-2 and is the answer not in the manual?

SpringWell SPRW-UV4-2 Specifications

General IconGeneral
BrandSpringWell
ModelSPRW-UV4-2
CategoryAccessories
LanguageEnglish

Related product manuals