EasyManua.ls Logo

Steca TR A502 TT - Page 12

Steca TR A502 TT
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
742.114 | 14.50
EN
Display Legend Terminal layout
1 swimming pool, 1 collector array
R2
T1
T2
T1: collector array sensor
T2: swimming pool sensor
R2: solar circuit pump
1,
2,
R2, N, PE (0–10 R2,
2)
)
1 swimming pool with external heat exchanger, 1 collector array
R1
R2
T1
T2
T3
T1: collector array sensor
T2: swimming pool sensor
T3: external heat exchanger sensor
R1: solar circuit pump
R2: swimming pool loading circuit
pump
1,
2,
3,
R1, N, PE (0–10 R1,
1)
)
R2, N, PE (0–10 R2,
2)
)
1 storage tank, 1 swimming pool, 1 collector array (pump-controlled)
T1
T2
T3
R1
R2
T1: collector array sensor
T2: lower storage tank sensor
T3: swimming pool sensor
R1: storage tank solar circuit pump
R2: swimming pool solar circuit pump
1,
2,
3,
R1, N, PE (0–10 R1,
1)
)
R2, N, PE (0–10 R2,
2)
)
1 storage tank, 1 swimming pool, 1 collector array (pump-/valve-controlled)
R1
R2
T1
T2
T3
T1: collector array sensor
T2: lower storage tank sensor
T3: swimming pool sensor
R1: solar circuit pump
R2: storage tank switching valve
6)
1,
2,
3,
R1, N, PE (0–10 R1,
1)
)
R2, N, PE
Tab. 1: Terminal pin assignments
1)
Terminal pin assignments for 0–10 V-controlled high-efficiency pumps: The power supply must
be connected to output R1 (N, PE); the control cable for the pump electronics must be con-
nected to 0–10
R1 and
2)
Terminal pin assignments for 0–10 V-controlled high-efficiency pumps: The power supply must
be connected to output R2 (N, PE); the control cable for the pump electronics must be con-
nected to 0–10
R2 and .
3)
Installation regulation: When no power is supplied to the switching valve, then no flow occurs
through the storage tank.
4)
Installation regulation: When no power is supplied to the switching valve, then the lower part
of the storage tank (T2) is loaded.
5)
Installation regulation: When no power is supplied to the switching valve, then the first priority
storage tank (T2) is loaded.
6)
Installation regulation: When no power is supplied to the switching valve, then the storage
tank (T2) is loaded.