EasyManua.ls Logo

Steiss 5 Series - Quick Start-up Guide; Arrival of Product; Preparation of Area

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Quick Start-up guide of Steiss DX550
3
ARRIVAL OF PRODUCT
BOX 1:
Air-Alternating mattress,
pump,
carry
bag, manual
PREPARATION OF AREA
1. Unpack
products
2. Place the Steiss DX550
Alternating Pressure Mattress directly
on
top
of the bed frame and
ensure
that the air hose is at the
foot
of the bed.
CAUTION: When securing the mattress to the bed, please ensure that you are securing onto
the
movable parts of the bed and NOT the actual bed frame, as this will obstruct the
mechanical
movement and could cause damage to both mattress and bed. The warranty for both
the
mattress and the bed may well be invalidated if damage is caused by this
means.
NOTE: When the mattress is opened for the first time, please write today’s date (with a
non-
Phenol based pen) in the top white box on the PU cover and add in the ‘same date’ for
the
following three years in the bottom white box. This will remind the care team when the
annual
service is
due.
3. Hang the Steiss DX550
pump
at the
foot
of the bed.
Connect
the
push-fit
hose
connector from
the
foot
of the
mattress
to the air
outlet
of the pump.
4. Plug the
pump power
cable
into
the
mains outlet. Ensure
that
electrical cables
are safe and
tidy,
are not
caught
in the bed frame and are free
from obstruction.
Turn the
power
on at the
mains outlet
and
turn
the
power switch
on the
pump
to the ‘ON’ position.
CAUTION: It is important to routinely inspect power cables to ensure they are not obstructed
or
causing a tripping hazard. Check the power cable is not under strain or is
damaged.
3. Quick Start-up guide of DX550

Related product manuals