EasyManua.ls Logo

STIEBEL ELTRON DHE 18 - Installation - Commissioning (Continued); Connecting Programming Unit and Appliance Cover; Appliance Handover to User and Safety Briefing

STIEBEL ELTRON DHE 18
51 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.stiebel-eltron.com DHE | 83
INSTALLATION
Commissioning
ENGLISH
D0000073198
Connect the programming unit connecting cable to the PCB.
Note
For undersink installation, the appliance cover should be
turned the other way up for easier operation; see chapter
"Installation alternatives/ Rotated appliance cover".
D0000053280
Hook the appliance cover at the top rear into the back panel.
Pivot the appliance cover downwards. Check that the appli-
ance cover is securely seated both top and bottom.
Tick the selected connected load and rated voltage on the ap-
pliance cover type plate (on both sides). Use a ballpoint pen
to do this.
Secure the appliance cover with the screw.
Fit the fascia to the appliance cover.
Remove the protective film from the user interface.
D0000053281
Switch on the power supply.
11.2.1 Appliance handover
Explain the appliance function to users and familiarise them
with how it works.
Make the user aware of potential dangers, especially the risk
of scalding.
Hand over the instructions.

Table of Contents

Other manuals for STIEBEL ELTRON DHE 18

Related product manuals