2.2 Installation
Transport
To protect the equipment against
damage, it must be transported vertically
inside its dedicated packaging. Where
space is restricted, you may also briefly
move the equipment tipped backwards at
an angle.
Positioning
— Position the device in the installation
location.
Note: Ensure that the casing
panel in the lower area of
the device is not damaged during
positioning.
— Remove packing straps and
polystyrene mouldings.
— Level the device by adjusting the
equipment feet.
— After leveling the device fix the nut of
the rubber feet to provide a maximum
of structural safety.
External installation
The location where the WWK is to be
installed must meet the following
conditions:
— Load-bearing floor (wet weight of the
WWK approx. 430kg).
— Never operate the WWK in rooms at a
risk from explosion due to dust, gases
or vapours.
— It is preferred that the location of
the unit is not near a bedroom or a
neighbour´s bedroom. Ideally a unit
may mounted near a kitchen or laun-
dry. Opposite a neighbours garage is
always prefferred.
— The water heater should be located
as close as possible to the most fre-
quently used hot water tap connec-
tion.
— Ensure that the data plate is clearly
visible.
— Ensure that the ambient temperature
lies within the application limits for
heat pump operation.
The heat pump must not be
installed in areas where ambient
temperatures frequently exceed 42°C
or areas where temperatures frequently
drop below 0°C.
Installation locations with aggressive air
(e.g. air loaded with ammonia, chlorine,
metals, oil, ...) are inadmissible because
they can cause damage to the device.
Where possible select an installation
location that has limited exposure to ex-
treme rain or snow.
Mount the unit so that it is not exposed to
direct strong wind, but is well ventilated.
The air inlet and outlet must be free. Pro-
tect your device with possibly a canopy, a
base and baffles to weather.
Internal installation
The room where the WWK is to be
installed must meet the following
conditions:
— Load-bearing floor (wet weight of the
WWK approx. 430kg).
— Never operate the WWK in rooms at a
risk from explosion due to dust, gases
or vapours.
— Include in your considerations the
utilisation of waste heat, for example
from a boiler, tumble drier or refrig-
erator/freezer.
— The available floor area in the instal-
lation room must be at least 6 m².
Never install this equipment in rooms
with a volume of less than 13 m³.
— Never restrict the clearances of the
WWK through walls and ceilings fur-
ther than illustrated in Fig.2.
!
The heat pump must not be
installed in areas where ambient
temperatures frequently exceed 42°C
or areas where temperatures frequently
drop below 0°C.
Air
Air
— In case of indoor installation and min.
installation room volume, the room
temperature might be reduced by ap-
prox. 1-3°C through the heat pump
operation. The initial temperature is
reached again approx. ½ h after the
heat pump has been switched OFF.
When installing the heat pump in a boiler
room, ensure that the boiler operation
will not be impaired.
Do not place the device near high fre-
quency machines.
2.3 Water connection
— Remove the protective caps from the
connectors.
— With a sharp knife, cut a hole into the
protective caps and invert over the
pipe to be connected.
— Connect the pipe and refit the
protective caps.
!
Please note: To protect against
the risk of corrosion, make the
connection as flat packing seal. The use
of hemp, teflon, or thread seal tape on
connections is not acceptable.
26�03�01�1619�
3
1
2
1 Condensate drain
2 Hot water connection
3 Condensate spillover
≥ 400
≥ 400
≥ 400
≥ 100
670
Fig. 2
Positioning
26�03�01�1618