SG 11 , SG 11 PLUS
English
8
N Stand the tank on a level surface.
N Fill up with thoroughly mixed plant 
protection/cleaning product. Do not 
exceed maximum capacity of 
1.5 liters (50.5 fl.oz) (see arrow).
N Fit the cover and tighten it down 
firmly.
Pressurizing the Tank
N Move the pump shaft (1) up and 
down uniformly about 20-30 times.
Checking Operation of Pressure Relief 
Valve
N Rotate the knurled wheel (2) as far 
as stop.
You should hear air escaping.
Spraying
N Operate the button (1).
When pressure begins to drop:
N Move the pump shaft up and down 
uniformly – about 15 strokes are 
necessary to restore full pressure.
SG 11 PLUS – Adjusting Spray Pattern
Rotate the nozzle to adjust the spray 
pattern (solid jet or fine mist).
Filling the Container
1.5 lt
0076BA002 AM
0076BA017 ST
Spraying