Do you have a question about the Strom SBSP11S and is the answer not in the manual?
Technical data for combination and system models, including electrical and plumbing.
Outlines the sequence of installation tasks from piping to electrical connections.
Lists final checks including thermostat programming and system testing.
Specifies installation by a qualified professional and adherence to regulations.
Advises on choosing a safe location, ensuring adequate clearance, and structural support.
Details the need for a suitable supply cable, isolator switch, and earthing.
Lists specific electrical connections to verify for security and proper seating before power-on.
Describes the steps for initial boiler power-up and standby mode activation.
Explains how to set key parameters like clock, flow temperature, and differential.
Details procedures for testing the heating circuit and hot water output.
Lists common error codes, their causes, and recommended troubleshooting solutions.
| Type | Electric Boiler |
|---|---|
| Power | 11 kW |
| Heating Element Material | Stainless steel |
| Heating area | 110 m² |
| Phase | Three |
| Mounting | Wall-mounted |