EasyManua.ls Logo

Stulz ULTRASONIC - Page 61

Stulz ULTRASONIC
71 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ULTRASONIC
61
Copyright STULZ GmbH 02/1997
INSTALLATION EXAMPLES FOR ENS HUMIDIFIERS
Install the humidifiers at the suction side.
Use an air rectifier in the airflow in front of the humidifier; heat exchangers
also fulfil the rectification function.
During heating process, the air temperature at the humidifier casing must
not exceed 40°C.
The distance to the next object behind the humidifier in airflow direction
should be larger than the humidifier path.
Provide a stainless steel pan corresponding to the lengthof the humidifier
path. The pan must be fitted with a drain, connected to a syphon. The height
of the syphon is dependent on the differential pressure (environment/
suction side in the unit).
To ensure that a sufficient carrier airflow is available for the aerosols that
are getting out the humidifier, a distance of > 10 cm to the pan has to be
provided for the lowest humidifier. The same is applicable on top of the
humidifier and at the sides.
1.
2.
3.
4.
5.
6.

Related product manuals