12 | Sub-Zero Customer Care 800.222.7820
Site Preparation
Placement
CAUTION
Before moving the unit into position, secure the door
closed and protect any finished flooring.
Use an appliance dolly to move the unit near the opening.
If the unit has been on its back or side, it must stand
upright for a minimum of 24 hours before connecting
power.
Plug the power cord into the grounded outlet and roll the
unit into position. Verify the anti-tip brackets are properly
engaged.
IMPORTANT NOTE: If used, the side panels must be
installed before the unit is placed in its final position. Refer
to page 14.
Custom Panels
For overlay and flush inset applications, custom door and
grille panels must be installed. The panel size is critical for
a proper fit. To verify panel requirements and dimensions,
refer to the Sub-Zero Design Guide at subzero.com/specs.
IMPORTANT NOTE: Flush inset applications require a mini-
mum ⁄"
(13) reveal on all sides.
Finish all sides of the custom panel. They may be visible
when the door is open or through the glass door.
CAUTION
A solid panel cannot be installed over the glass door.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Subzero Classic Series and is the answer not in the manual?

Subzero Classic Series Specifications

General IconGeneral
Available Widths24"
Interior LightingLED lighting
Temperature ZonesDual Zone
Energy EfficiencyEnergy Star
FinishStainless steel
SeriesClassic Series

Related product manuals