EasyManua.ls Logo

Sullair 4500 User Manual

Sullair 4500
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Failure to follow the instructions
and procedures in this manual or,
misuse of this equipment will
VOID its warranty!
WARRANTY NOTICE
PART NUMBER:
KEEP FOR
FUTURE
REFERENCE
USER MANUAL
©
SULLAIR CORPORATION
The information in this manual is current
as of its publication date, and applies to
compressor serial number:
and all subsequent serial numbers.
02250176-182 R04
201107010000
INDUSTRIAL AIR COMPRESSOR
3000P, 3700, 4500
3000PV, 3700V, 4500V
30, 37 & 45 KW/40, 50 & 60HP
Question and Answer IconNeed help?

Do you have a question about the Sullair 4500 and is the answer not in the manual?

Sullair 4500 Specifications

General IconGeneral
Model4500
Pressure Range100-150 psi
TypeRotary Screw
Operating Pressure100 PSI
Drive TypeDirect

Summary

Section 1 - Safety

Personal Protective Equipment (PPE)

Requirements for PPE like eye, face, and hearing protection.

Fire and Explosion Prevention

Precautions to prevent fire and explosion hazards.

Toxic and Irritating Substances

Handling of toxic materials and ventilation requirements.

Electrical Shock Hazards

Critical safety procedures for electrical hazards.

Section 2 - Component Description

Cooling and Lubrication System Function

How the cooling and lubrication systems work.

Control System Functionality

How the control system regulates compressor operation.

VSD Control System Functionality

How the VSD control system manages compressor output.

Section 3 - Specifications

Wiring Diagram: VSD Air-Cooled

Electrical wiring diagram for VSD air-cooled units.

Wiring Diagram: Air-Cooled MFV w/ Dryer

Wiring diagram for air-cooled MFV with dryer.

Wiring Diagram: Air-Cooled MFV

Wiring diagram for air-cooled MFV units.

Wiring Diagram: YD CE

Wiring diagram for YD CE models.

Section 4 - Installation

Compressor Mounting and Foundation

Guidelines for proper compressor mounting and foundation.

Ventilation and Cooling Requirements

Requirements for adequate ventilation and cooling.

Electrical Preparation and Checks

Steps for preparing electrical connections and checks.

Motor Rotation Direction Check

Procedure to verify correct motor rotation direction.

Section 5 - WS Controller

Section 6 - Maintenance

2000-Hour Maintenance Schedule

Scheduled maintenance tasks performed every 2000 hours.

Troubleshooting Guide and Solutions

A guide to diagnosing and resolving common compressor problems.

Related product manuals