INSTALLATION, START-UP & MAINTENANCE MANUAL
SD-220 TO SD-600
REV 04 – 10 Oct 2003
Page 15 of 32
SECTION 4: MAINTENANCE
Note - In order to ensure continuous and trouble-free operation, a
maintenance contract with an authorized Sullair distributor is recommended.
The following points should be checked regularly:
Daily
Carry out a general visual check and watch out for possible disruptions during
operation.
Check function by manually operating the automatic condensate drain on the pre-
filter.
Do an optical color test on the blue gel indicator:
Indicator Color Approx. dew point [ °C]
Blue gel
Blue
Pink
Transparent
- 25
0
+ 15
Weekly
Check the differential pressure on the pre-filter, which should not exceed 10
PSID. Values greater than this indicate that the filter element must be changed.
Check the differential pressure on the after-filter, which should not exceed 10
PSID. Values greater than this indicate that the filter element must be changed.
Check the pressure of the regenerating vessel during regeneration after
depressurization. Any backpressure caused by blocked exhaust silencers will be
show here. Backpressure on the regenerating tower should not exceed 5 psig.
Drain inlet and exhaust valve chambers using valves
provided below the valve (photo right).
Drain pilot air filter housing of any condensate
(photo left).