EasyManua.ls Logo

Sumitomo F-20L - Page 42

Sumitomo F-20L
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance
38
6. Reconnect the supply (red) gas line to the supply coupling on the compressor. Torque the
coupling to 47 ± 7 Nm (35 ± 5-ft. lbs.).
7. Using Snoop
®
, leak check all Aeroquip couplings just completed. Wipe off the Snoop
®
to
prevent rusting. See the Leak Check procedure in Maintenance in this manual. See Figure
17.
Figure 17 Leak Check Aeroquip Couplings
8. Check the equalization pressure. See Specifications in the Operating Manual.
9. Reinstall the compressor’s cover panel.
This completes the procedure for replacing an adsorber.

Related product manuals