3 Product Description System Manual
12
Communication box and control panel (upper part and lower part respectively)
3.3.2 Bottom Cable Entry
Cable entries are designed on the bottom of MV Station. All cables connecting MV Station
and external devices run in and out through the bottom cable entries.
Bottom View
Table 3-1 Cable entry of MV Station
All LV side cables connecting the MV transformer go inside
through this entry.
This entry is designed for future cleaning and oil tray
maintenance.
Communication and
power distribution
cables entry
All communication and power distribution cables
connecting external device go inside through this entry.
All MV side cables connecting downstream MV grid go
inside through these entries.