EasyManua.ls Logo

Sungrow SBR128 - Page 30

Sungrow SBR128
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
A: Upper surface of the base B: Base(front view)
C: Measurement baseline D: Base(top view)
Mark the hole positions along a line vertical to the measurement baseline.
The feet of the base have been installed already.
step 3 Drill the holes according to the marked positions, and install the expansion sleeves.
Goggles and gloves are necessary when drilling holes for protection. Shield the
battery during drilling. After drilling, clean up debris in time.
step 4 Position the base maintaining the required distance from the wall.
4 Mounting User Manual

Related product manuals