EasyManua.ls Logo

Sunquest Pro 14SE - Pre-Installation Planning

Sunquest Pro 14SE
23 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
Pre-Installation Planning
Before you begin to assemble your sunbed, you should observe the following pre-
installation considerations.
Installation-Pre-Installation Planning
• Your sunbed operates from a 120V ac source. You should have a NEMA
5-20R electrical outlet (like the type shown below) installed in the room
in which you will use the unit. The outlet should be on a dedicated cir-
cuit capable of providing 20 Amp service. (We recommend installation by
a professional electrician.) The outlet must be earth grounded.
20 AMP NEMA #5-20R RECEPTACLE
• Make sure the room in which you intend to use your sunbed is well
ventilated. Air from the room is used to cool the sunbed, and a poorly
ventilated room may cause the unit to become hot and cause discomfort
to the user.
• Your sunbed is designed to operate in an ambient room temperature of
80°F maximum and 70% relative humidity.
• Place your sunbed no closer than 6" from any wall. Make sure that cur-
tains, drapes, and other room furniture do not obstruct the airflow into
the end caps or out of the fan opening areas.
• Proper assembly of your sunbed requires three people. Plan to have a
couple of helpers assist you.

Related product manuals