Figure 4-19
Attention
If there’re more than one inverter in a project, do not open all inverters roof cover at the
same time if you cannot fi nish the AC connection immediately.
Any damages caused by the moisture and dust that came into the inverter on account of
exposed to the air for a long time are out of Sunways warranty.
4.5 Monitoring Device Installation





4 Installation 4 Installation
Figure 4-20
Figure 4-18
󾗑 


L1
L2
L3
PE
N