EasyManua.ls Logo

SUPAIR Strike - Installing the reserve parachute.; Connecting the handle to the rescue parachutes deployment bag.

SUPAIR Strike
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Harness User’s manual
SUP’AIR _STRIKE_ Page 13
Thank you for reading the following carefully ! We recommend for the initial rescue parachute assembly and installation to be made
by a qualified professional.
Reserve parachute folding and installation inside the harness must conform to the specific guidelines found in this manual.
Connecting the handle to the rescue parachute’s deployment bag.
1.
Fasten the handle strap
to the POD’s middle loop by
making a loop to loop ( Lark’s
head ) knot.
2. Tighten the handle/POD
connection securely.
Installing the reserve parachute.
D
Single reserve parachute handle.
Reserve parachute handle ( Ref.POIFSK ).
Reserve parachute inside its deployment bag and folded according the
manufacturer’s specifications.
Parachute rigging lines
B
C
A
D
B
C
A

Related product manuals