EasyManua.ls Logo

Super Hot 304B - Replacement Parts; ORDERING

Super Hot 304B
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electric Booster– Installation, Operating and Maintenance Instructions
9
If the wash tank of the dishwasher is filled through the booster heater, this will use up all the
180ºF water in storage. Sufficient time must be allowed to reheat the water in storage before
starting the dishwasher.
Water pressure at the inlet to the booster heater must be adequate for proper operation of the
rinse cycle of the dishwasher.
Be sure that the relief valve is one supplied by Allied Engineering Company.
A check valve should not be installed ahead of the booster heater. Remove if present.
REPLACEMENT PARTS Section 6
6.1 ORDERING
Replacement parts or a replacement booster heater may be purchased through any Allied Engineering
Company distributor call us if you need help locating a distributor near your area. If you require any
technical assistance or have any comments about our product, please write or phone us at:
Service Department
Allied Engineering Company
94 Riverside Drive
North Vancouver, B.C. CANADA
V7H 2M6
Tel (604) 929-1214 Fax (604) 929-5184
Email: sales@alliedboilers.com
NOTE: To supply the correct part it is important that you state the model number and serial number.
Figure 3 – Replacement Parts