EasyManua.ls Logo

Supermicro AS-1024US-TRT - Page 31

Supermicro AS-1024US-TRT
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
Chapter 3: Maintenance and Component Installation
10. Replace the screws in the order 1-2-3, tightening to 16.1 kgf-cm (14 lbf-in) of torque.
The Force Frame secures both the Rail Frame and CPU Package.
Caution: Tightening must be executed in proper 1-2-3 sequence to avoid causing catastrophic
damage to the socket or CPU Package.
Figure 3-9. The Force Frame Secured
Figure 3-8. Securing the Force Frame

Table of Contents

Related product manuals