EasyManua.ls Logo

Suzuki DF115A - BATTERY INSTALLATION AND REQUIREMENTS; BATTERY SPECIFICATIONS

Suzuki DF115A
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
BATTERY INSTALLATION
BATTERY REQUIREMENT
650 Marine Cranking Amps (MCA)/ABYC,
or 512 Cold Cranking Amps (CCA)/SAE
or 160 Reserve Capacity (RC) Minutes/SAE
NOTE:
The specifications listed above are the mini-
mum battery rating requirements for starting
the engine.
Additional electrical loads from the boat will
require larger capacity batteries. Consult
your Suzuki dealer to determine the proper
battery sizing for your boat and engine com-
bination.
Dual-purpose (Cranking/Deep-cycle) batter-
ies can be used if they meet the minimum
specifications listed above (MCA, CCA, or
RC).
Do not use a Deep Cycle battery for the main
cranking battery.
When connecting batteries in parallel, they
must be of the same type, capacity, manufac-
turer, and of similar age. When replacement
is necessary, they should be replaced as a
set. Consult your Suzuki dealer for proper
battery installation information.
BATTERY INSTALLATION
Secure the battery in a dry area of the boat,
away from vibration.
NOTE:
It is recommended that the battery be
installed in an enclosed battery case.
When connecting batteries, hexagon-nuts
must be used to secure battery leads to bat-
tery posts.
To hook up the battery, first connect the red
lead from the motor to the positive battery ter-
minal, then connect the black lead to the nega-
tive battery terminal.
WARNING
If you place the battery near the fuel tank,
a spark from the battery may ignite the
gasoline, causing a fire and/or an explo-
sion.
Do not place the fuel tank in the same
compartment/area as the battery.
Red lead
Sub battery cable
Black
lead
White lead
Hexagon-nut

Table of Contents

Related product manuals