EasyManua.ls Logo

Suzuki DR600S - Page 22

Suzuki DR600S
230 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PERIODIC
MAINTENANCE
AND
TUNE-UP
PROCEDURES
2-10
NECESSARY
AMOUNT
OF
ENGINE
OIL
Oil
change
2
300
ml
(2.4
US
qt)
Filter
change
2
450
ml
(2.6
US
qt)
Overhaul
engine
2
600
ml
(2.7
US
qt)
CARBURETOR
IDLE
RPM
(Idling
adjustment)
Inspect
Initial
1
000
km
(600
miles)
and
Every
6
000
km
(4
000
miles)
NOTE:
itis
Make
this
adjustment
when
the
engine
is
hot.
Connect
a
tachometer.
e
Start
up
the
engine
and
set
its
speed
at
anywhere
between
1200
and
1400
r/min
by
turning
the
throttle
stop
screw
(1).
Turn
in
or
out
the
pilot
screw
within
1/2
turn
from
the
standard
setting,
and
set
it
when
the
engine
speed
is
at
the
highest
possible
level.
e
After
this
adjustment,
recheck
the
idling
speed
and
adjust
to
between
1
200
and
1
400
r/min
with
throttle
stop
screw
if
necessary.
THROTTLE
CABLE
PLAY
(Pulling
cable
play)
The
pulling
cable
@
should
be
adjusted
to
have
a
play
®
of
0.5
1.0
mm
(0.02
0.04
in).
If
the
adjustment
is
necessary,
adjust
the
play
in
the
following
way:
@
Loosen
the
lock
nut
@)
and
turn
the
adjuster
in
or
out
to
obtain
the
correct
play
@
0.5
1.0
mm
(0.02
0.04
in).
e
After
adjusting
the
play,
tighten
the
lock
nut
@).
(Returning
cable
slack)
The
returning
cable
(8)
should
be
adjusted
to
have
a
little
slack
©).
If
the
adjustment
is
necessary,
adjust
the
slack
in
the
following
way:
@
Loosen
the
lock
nuts
@
and
reduce
the
slack
©
to
little
by
turning
the
adjuster
©
.
e
After
adjusting
the
slack,
tighten
the
lock
nuts
®.
WARNING:
After
the
adjustment
is
completed,
check
that
handlebar
movement
does
not
raise
the
engine
idle
speed
and
that
the
throttle
grip
returns
smoothly
and
automatically.

Related product manuals