EasyManuals Logo

Tait TB7100 Installation Guide

Tait TB7100
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
14 Installation TB7100 Installation Guide
© Tait Electronics Limited March 2006
1.8.3 Mounting the Base Station
1. Fit the base station into the cabinet or rack and secure it firmly with
an M6 (or 0.25in if you are using imperial fittings) screw, flat and
spring washer in each of the four main mounting holes
b, as shown
in Figure 1.3 on page 14.
2. The base station can be wall-mounted by rotating the front mounting
brackets and fitting the optional rear brackets (TBBA03-01). When
the base station is wall-mounted ensure the airflow is from bottom to
top (front panel mounted down) or side to side.
3. For transport or in installations subject to vibration, the base station
should be supported at the rear using a transit bracket
(Tait recommends to use the TB7100 transit bracket, Tait part
number TBBA03-04).
Figure 1.3 Base station mounting points (configuration with AC power supply unit shown)
b
main mounting holes
e
DC power connector
c
base station
f
AC power connector
d
ground point
G
rack frame
G
E
c
b
f
D

Other manuals for Tait TB7100

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tait TB7100 and is the answer not in the manual?

Tait TB7100 Specifications

General IconGeneral
BrandTait
ModelTB7100
CategoryAccessories
LanguageEnglish

Related product manuals