OPERATION
Digging side drains
OPERATING PROCEDURES
Use the boom swing function to dig side
ditches as shown in the figure.
Loading
When loading dirt onto a truck bed, load
from the back of the truck, as it is easier and
able to load more load than doing it from the
front.
Also, use a small slewing angle for greater
efficiency.
Leveling
1. Bring the hoe attachment close to the
body.
2. Gradually remove the dirt from the side of
the mound.
3. Once the mound is low, remove the dirt
from the top. If the load becomes too
heavy for the machine body, adjust by
raising or lowering the dozer blade.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Takeuchi TB260 and is the answer not in the manual?

Takeuchi TB260 Specifications

General IconGeneral
BrandTakeuchi
ModelTB260
CategoryExcavators
LanguageEnglish

Related product manuals