EasyManua.ls Logo

Taylor c713 - Page 24

Taylor c713
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
C713 Operator TrainingC713 Operator Training
22
C713 Operator TrainingC713 Operator Training
Disassembly
Step 1
Place the power switch in the OFF position.
Step 2
Remove the handscrews, freezer door, beater and scraper blades, and drive shaft with drive shaft
seal from the freezing cylinder.
Step 3
Remove the scraper blades from the beater assembly.
Step 4
Remove the drive shaft seal from the drive shaft.
Step 5
Remove the freezer door gasket, front bearing, pivot pin, draw handle, draw valve, prime plugs and
design caps. Remove the three o-rings from the draw valve.
Repeat these steps on the other side of the machine.
Step 6
Remove the front drip tray and splash shield.
Step 7
Remove all drip pans. Take them to the sink for cleaning.
Note: If the drip pans are filled with an excessive amount of mix, it is an indication that the drive
shaft seal(s) should be replaced or properly lubricated.

Other manuals for Taylor c713

Related product manuals