EasyManuals Logo

Taylor c713 Operator Training

Taylor c713
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #4 background imageLoading...
Page #4 background image
C713 Operator TrainingC713 Operator Training
2
C713 Operator TrainingC713 Operator Training
Impact Servings:
How many servings can be drawn before the product becomes soft (unservable)?
Recovery Time: 1 - 2 minutes
Note: The soft serve draw rate is critical.
The rate must be 5 - 7.5 oz. (150 - 225 g.) per 10 seconds.
The way we measure
capacity is by how many
servings can be drawn before
the machine needs time to
recover the mix to the proper
viscosity.
The C713 can handle the
following impact servings:
35- 3.5 oz. Sundaes
Note: The machine needs 1-2
minutes of recovery time after
this level of impact servings.
35 servings
Impact Servings:
Consistency/Capacity

Other manuals for Taylor c713

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Taylor c713 and is the answer not in the manual?

Taylor c713 Specifications

General IconGeneral
TypeSoft Serve Freezer
Number of Flavors2
Refrigeration SystemAir or Water Cooled
Separate Hopper RefrigerationYes
Indicator LightsYes
Water CooledYes
Electrical208-230V, 1PH, 50/60Hz
MotorTwo 1.5 HP
Air Cooled Minimum Clearance6" on both sides

Related product manuals