Flushing technology
6-14
TECE flushing technology – U 1 urinal flush valve
Installing the mechanical U 1 urinal flush
valve housing
If applicable, set the flush volume before mounting the
cartridge (factory setting = litres). To do this, remove the
retaining ring and insert it back into the corresponding slot:
The first slot corresponds to a flush volume of litre, the
second to litres, and the third slot to a flush volume of
litres. Without a retaining ring, the flush valve will flush a
volume of – litres.
Screw in the mechanical cartridge.
Screw in the actuating rods as described above (e.g. for
the TECEambia, distance to wall surface = mm), and
screw on the counter nut to prevent them from turning.
Open the inlet flow control.
Screw the support frame onto the urinal flush valve hous-
ing.
Finally, mount the flush plate cover (here, TECEambia).